Transed Lrt logo

Company · Urban Transit Services

Transed Lrt

Stage one of the Valley Line connects Mill Woods to downtown Edmonton with about 13.1 km of light rail transit (LRT). This stage includes 11 stops, an elevated station incorporating a transit centre and Park & Ride, and a transfer point to other LRT lines at Churchill Square. The Valley Line Southeast is different from the high-floor LRT system on Edmonton's other lines. The Valley Line Southeast features new, low-floor, urban-styled trains that provide more pedestrian-friendly access with street level stops. In residential and commercial areas, embedded tracks are integrated with the established design and traffic flow of the area. Pre-construction work began in March 2016 and stage one of the City of Edmonton’s Valley Line LRT became operational in November 2023.

Team composition

Roles at Transed Lrt

51 to 200 staff

  • 5lrv technician
  • 2asset maintenance supervisor
  • 2financial analyst
  • 2laborer
  • 2lrv operations
  • 2lrv operator
  • 2train crew supervisor
  • 2transed-edmonton valley line lrt
  • 1administrative assistant
  • 1asset management (planning and scheduling) -erp administrator
  • +36more roles

Reveal on Kipplo

Get the full team — names, verified emails, phone numbers — in the Kipplo app.

Unlock team

Filed under Urban Transit Services in Canada.